Aktualisiert auf 21/12/2023

27.05.2019 - 1-MW hybrid system

With supplying no. 4 generating sets operating in parallel with the photovoltaic system and related batteries, Margen has contributed to the construction of a 1-MW complex hybrid system.

The generating sets have software packages to communicate with the several plant equipment and guarantee various types of operation depending on the state of the main busbar, rationalizing consumption and optimizing the available energy sources. 

The plant is at the Vatopedi monastery in Greece, in a non-electrified area.